3.8 - Shut Down - Temporary (Daily) and Permanent
3.8.1 - Temporary Shut Down
• Inspect equipment at the start of each shift (pre-op) and at the end of each shift (post-op).
• Correct all major defects and safety defects prior to the start of work.
• All air and water lines and pumps should be drained when not in use if freezing weather is expected.
If appropriate, the rig should be winterized at the end of each day.
• All unattended boreholes must be adequately covered or otherwise protected to prevent drill rig
personnel, site visitors, or animals from stepping or falling into the hole.
• For remote, idled, or access controlled sites, clearance holes can be left open, however, use hazard
cones, fencing or other methods to identify the hazard.
3.8.2 - Demobilization
• Refer to the pre-travel inspection and safe driving procedures outlined in Section 1 and 2 when
demobilizing.
• When loading equipment prior to demobilization, be especially alert to potential back injuries. Use
proper lifting techniques including getting help if necessary.
• Verify any waste materials have been removed from the site or properly contained, labeled and
scheduled for pickup.
• All open boreholes should be covered and protected or backfilled adequately and according to local
and state regulations on completion of the drilling project.