Environmental Remediation Drilling
Safety Guidelines
Page 109 of 132
JOB SAFETY ANALYSIS FORM
JOB TITLE/TASK: Drilling/Boring and Associated Soil Sampling
PROJECT ID PROJECT MANAGER:
DATE: REVISION: HEALTH/SAFETY DIRECTOR:
RECOMMENDED PERSONAL PROTECTIVE EQUIPMENT (PPE): _X_ Safety Glasses w/ Sideshields _X_ Steel-toed Boots
_X_ Hard Hat _X_ Nitrile Gloves _X_ Leather Work Gloves _X_ Other __Hearing protection and High Visibility Vest ___X____
JOB STEP
POTENTIAL
HAZARDS
PREVENTATIVE/CORRECTIVE ACTION
APPLIES TO
PROJECT
(Y/N)
Establish designated smoking area away from work area
Ensure type ABC, 20-lb, fully charged fire extinguisher on-site and within
inspection period
As site conditions/activities warrant, establish Hot Work Permit including air
monitoring using direct-reading, real-time instruments such as LEL/ O
2
meter
Stop work if hazardous conditions (explosive atmosphere) are identified
Ambient Air
Monitoring
Vapors Approach area where vapors are suspected from upwind direction and stay
upwind/crosswind of from potential sources of vapors (use flagging or
similar device to indicate wind direction)
Ineffective Air
Monitoring
Ensure personnel using have been trained on instrument use
Calibrate instrument prior to use
Concrete
Coring
Ignition
Sources
Ensure electrical equipment properly grounded
Apply water as necessary to address surface sparking potential
High Noise
Levels
Hearing protection required when working around operating equipment if
levels are suspected to be >85 dBA (if have to yell to person at a dist of 3 ft
to be heard, likely exceeding 85 dBA).
Airborne
Particulates
and Debris
Use water as necessary to control dust in area
Wear appropriate PPE including face shield or safety glasses with side
shields, dust mask, leather gloves and long sleeves
Sharp Rough
Materials
Wear appropriate PPE including leather gloves, long sleeves and pants,
and steel-toed boots
Impact to
Subsurface
Lines
Ensure all underground features have been identified in area per SCP prior
to start of activities
Drill Rig
Set-Up
Rig Roll Over Do not move rig with mast raised
Cross all hills and obstructions head on
Set riggers prior to raising mast
If soil appears unstable, the soil should be assessed by a qualified
professional engineer to ensure safe conditions with implementation of
design control measures prior to start of work
Contact with
Electric Lines
Position rig to avoid overhead utility lines by distance defined by voltage
and local regulations