Environmental Remediation Drilling
Safety Guidelines
Page 105 of 132
JOB SAFETY ANALYSIS FORM
JOB TITLE/TASK: Pre-Ground Disturbance Clearance Activities
PROJECT ID PROJECT MANAGER:
DATE: REVISION: HEALTH/SAFETY DIRECTOR:
RECOMMENDED PERSONAL PROTECTIVE EQUIPMENT (PPE): _X_ Safety Glasses w/ Sideshields _X_ Steel-toed Boots
_X_ Hard Hat _X_ Nitrile Gloves _X_ Leather Work Gloves _X_ Other _As specified in HASP and JSA Job Step_______
JOB STEP
POTENTIAL
HAZARDS
PREVENTATIVE/CORRECTIVE ACTION
APPLIES TO
PROJECT
(Y/N)
Ensure type ABC, 20-lb, fully charged fire extinguisher on-site and
within inspection period
As site conditions/activities warrant, establish Hot Work Permit
including air monitoring using direct-reading, real-time instruments
such as LEL/O meter
Stop work if hazardous conditions (explosive atmosphere) are
identified
Ambient Air
Monitoring
Vapors Approach area where vapors are suspected from upwind direction
and stay upwind/crosswind of from potential sources of vapors (use
flagging or similar device to indicate wind direction)
Ineffective Air
Monitoring
Ensure personnel using have been trained on instrument use
Calibrate instrument prior to use
Breaking-Up
and
Removing
Asphalt/
Concrete
Cover by Saw
Cutting or with
Heavy
Equipment
Heavy Equipment
Movement
Heavy equipment should be equipped with back-up alarm or use horn
when backing
Do not allow personnel to stand within the swing radius of equipment
booms/arms when equipment is in operation
Stay clear of operating equipment and heavy equipment when moving
When approaching heavy equipment, approach should be made from
the front ensuring eye contact is made with operator
Suspended Loads Do not walk under suspended loads
Wear appropriate PPE including hard hat
Ignition Sources Ensure electrical equipment properly grounded
Apply water as necessary to address surface sparking potential
Equip heavy equipment with non-sparking bucket/blade
High Noise Levels Hearing protection required when working around operating
equipment if levels are suspected to be >85 dBA (if have to yell to
person at a dist of 3 ft to be heard, likely exceeding 85 dBA).
Airborne
Particulates and
Debris
Use water as necessary to control dust in area
Wear appropriate PPE including face shield or safety glasses with
side shields, dust mask, leather gloves and long sleeves
Heavy Material
Lifting
Use heavy equipment to lift
Do not lift or move heavy materials (greater than 50 lbs) without