Environmental Remediation Drilling
Safety Guideline
Page 14 of 132
SECTION 1 - PRE-FIELDWORK
1.1 - Introduction
Environmental drilling can be performed safely with proper pre-fieldwork planning and proactive
adjustment of planned safe work procedures to actual conditions in the field. As every experienced driller
and environmental professional knows, it is very difficult to predict all hazards that may be encountered
during drilling fieldwork. The pre-field work preparations suggested here are applicable to mechanical
drilling and push probe where portable drill rigs are used for soil boring advancement, subsurface soil and
water sample collection, or groundwater monitoring well installation. If these pre-fieldwork preparations are
diligently completed, the job can proceed safely and smoothly with less down time. It is recommended that
supporting documentation for the pre-fieldwork preparations is retained in the project files.
1.2 - Planning the Project
Project planning begins when the customer’s drilling needs are made known to the environmental consultant
or driller. Pre-fieldwork planning can be reflected in a proposal to the customer to secure the work
assignment, or in a work plan used to communicate the technical approach and work procedures that will be
used to safely complete the work. Following award of the project to a contractor, planning and scheduling
should focus on preparations that will contribute to a safe and efficient operation at the job site. Much of the
responsibility for planning, effective communication, and associated task work rests with the contractor’s
project manager, however, experience has demonstrated participation by the customer’s project manager,
(with other key personnel as needed) and the contractor’s field team in the planning process significantly
contributes to insuring a safe and efficient job site.
The following list of items should be considered during the project planning stage prior to mobilizing to
begin fieldwork:
Scope of work - overall project and drilling task objectives
Customer, corporate, and job-site health and safety requirements
Technical approach (the means and methods to accomplish customer scope of work)
Procurement and vendor selection
o Technical capabilities and equipment
Drillers
Public and private utility locators
Traffic control and security
Laboratory services (including data validation)
Waste transportation and disposal
o Pre-qualification requirements to be considered
Safety performance
Training and experience of personnel
Age and condition of required equipment